Should Hotel Bedroom Furniture Be Priced in Euros, US Dollars or Turkish Lira?
The currency in your furniture quote decides who carries exchange-rate risk and how long a price can be held. This guide helps overseas hotel buyers choose between euro, US dollar and Turkish lira.
The furniture quote currency you choose, whether euro, dollar or Turkish lira, decides who carries the exchange-rate risk between order and final payment. It also affects how long a quotation can stay valid. For most overseas hotel projects supplied from Turkey, a hard currency such as the euro or the US dollar is the practical choice, but the right answer depends on where your money sits and where the factory's costs arise.
Below we explain the logic in plain terms, so you can discuss it with your finance team and with any supplier, including us at Palmiye.
Why currency is a risk question, not only a pricing question
A quotation is a promise to supply goods at a stated amount. If that amount is written in a currency other than the one in which you earn or hold funds, you take on exchange risk. If it is written in a currency other than the one in which the factory pays wages, boards and hardware, the factory takes on risk instead.
Hotel furniture projects are long. Between drawing approval, production, shipping and the final instalment, several months can pass. During that time exchange rates can move in either direction, and that movement can change the real cost of the package for one party or the other.
Understanding the factory's cost base
A Turkish furniture factory has a mixed cost structure. Labour, energy, rent and local services are paid in Turkish lira. Many materials and components are linked to foreign currencies, either directly or through the prices set by suppliers. These include imported boards, some hardware, certain fabrics and finishes, and sea freight.
This mix explains why exporters usually prefer to quote in euros or US dollars. Their material costs track hard currencies, and their export income arrives in hard currencies. Quoting in lira for an overseas buyer would leave the factory exposed to input price changes that the quotation cannot follow.
Euro, US dollar or Turkish lira: a practical comparison
| Option | Who carries exchange risk | Typically suits | Points to watch |
|---|---|---|---|
| Euro (EUR) | Buyer, if funds are in another currency; shared if the buyer earns in euros | European projects, buyers with euro budgets, Mediterranean and North African markets | Check which exchange rate applies if you pay from a non-euro account |
| US dollar (USD) | Buyer, if funds are in another currency | Gulf, Central Asia, Africa and projects where local currencies are linked to the dollar | Confirm whether freight and installation are also shown in dollars |
| Turkish lira (TRY) | Mostly the buyer if payment is made from abroad; the factory if costs rise before payment | Buyers who already hold lira or operate inside Turkey | Price validity is usually short and the quote may need frequent updates |
This table is a general guide. Actual terms depend on your contract and on the supplier you work with.
How currency affects quotation validity
Validity and currency are closely linked. When a price is stated in a currency that is stable relative to the factory's costs, the supplier can hold it for longer. When the currency is volatile against those costs, the supplier has to shorten the validity period or add a review clause.
Raw material prices add another layer. Even in a hard currency quote, board, veneer and hardware prices can change before you confirm the order. Many factories therefore state a validity period and ask that the deposit be received within it.
The exact period varies by supplier and project, so ask for it in writing. If your approvals take longer than the stated validity, ask the factory what happens: a price refresh, a partial lock on materials, or a fixed price against an early deposit.
Ways buyers and exporters share exchange risk
You do not have to accept all of the risk or push all of it onto the factory. Common approaches include:
- Fixed price in one hard currency: simple to budget, with risk on you if your own currency weakens.
- Fixed price with a validity limit: the price holds until a stated date, after which it can be updated.
- Staged payments: a deposit at order, a payment before shipment and a balance on delivery or installation, each in the contract currency.
- Adjustment clause: the price is reviewed if a named exchange rate moves beyond an agreed range. This needs clear wording to avoid disputes.
- Early material purchase: the factory buys boards and hardware once the deposit is received, which reduces its own exposure and can support a longer price hold.
None of these is automatically better. The right structure depends on the project size, the timeline and how comfortable both parties are with currency movements.
Which currency should you choose?
Use these questions to narrow the decision:
- In which currency is your project budget held? Matching the quote currency to your budget removes one source of risk.
- Which currency do your other FF&E suppliers use? Keeping the whole package in one currency makes comparison and reporting easier.
- Does your bank charge conversion fees or restrict certain currencies? Ask before you sign.
- Are you comparing quotations from several countries? Convert them to one currency on the same date, and note the rate you used.
- How long will approvals take? A longer programme calls for a clearer validity and payment schedule.
Keeping the contract currency consistent
Once you pick a currency, apply it everywhere. Furniture price, packing, freight under the chosen Incoterms (EXW, FOB, CIF or DAP), installation and spare parts should be stated clearly, ideally in the same currency. Mixed currencies inside one contract make payments harder to reconcile.
Also confirm which rate applies if you pay in a different currency from the one in the contract. Name the source of the rate and the date it applies. This small detail avoids misunderstandings at the final payment.
What to ask any supplier before you decide
- In which currency is the quotation issued, and can it be issued in another?
- How long is the price valid, and what happens after that date?
- Are freight, packing and installation priced in the same currency?
- Is the price affected by raw material changes before the deposit is paid?
- Which payment schedule applies, and in which currency is each instalment due?
- Are bank charges the buyer's or the seller's responsibility?
A note on professional advice
Currency decisions have financial consequences. This article is general information about how pricing terms work, not financial or legal advice. For large contracts, speak to your finance team, your bank or a legal adviser before you fix the currency and the payment terms.
Conclusion
Currency does not change the furniture itself, but it changes how the risk is shared. A euro or US dollar quotation is usually the most workable basis for an international hotel project from Turkey, while a clear validity period and payment schedule matter just as much as the currency. Agree on both before approving drawings.
We supply hotel and hospitality furniture to buyers around the world. If you are planning a project, send us your drawings or room schedule, tell us which currency you prefer, and we will prepare a quotation that states the currency, the validity period and the payment terms clearly.
Sıkça Sorulan Sorular
Which currency is most common for export furniture quotations from Turkey?
Euros and US dollars are the most common for export quotations. Factories pay many material and freight costs linked to hard currencies, so quoting in them keeps the price closer to real costs. Your preferred currency can be discussed when you request a quotation.
Can I ask for a hotel furniture quote in Turkish lira?
You can ask, but it is rarely the simplest option for overseas buyers. Because material costs change, lira quotations usually carry short validity periods and may need updating. Most international buyers choose euros or US dollars for easier budgeting.
How long does a furniture quotation stay valid?
Validity differs by supplier, project size and market conditions, so there is no standard period. Check the date printed on the quotation and ask what happens afterwards, for example a price refresh or a lock against an early deposit.
Who pays if the exchange rate moves after I sign the contract?
If the price is fixed in one currency, the party whose own funds are in a different currency carries the movement. Usually that is the buyer. Staged payments or an adjustment clause can share the risk, as long as the wording is clear.
Should freight and installation be priced in the same currency as the furniture?
Ideally yes. One contract currency makes budgeting and payment reconciliation easier. If freight or installation is quoted in a different currency, ask for the exchange rate source and date, and confirm it in writing.
Every hotel project is different. Send us your drawings or room schedule for a tailored proposal on materials, lead time and shipping.




